Effluent Pump vs Sewage Pump: What's the Difference?

Effluent Pump vs Sewage Pump: What's the Difference?

An effluent pump moves the settled wastewater that leaves a septic tank. A sewage pump handles raw wastewater from toilets and other fixtures. Effluent pumps generally have a smaller solids passage. If the pump will receive toilet waste, choose equipment rated for that duty and verify the locally adopted plumbing code.

Compare effluent, sewage, sump and grinder pumps, then use the sizing steps to match a pump to a drain field, mound or dosing system. Browse both types in our sewage and effluent pump collection.

What Is an Effluent Pump?

Inside a septic tank, solids settle and grease floats. The liquid between those layers is called effluent. If it needs to reach a higher drain field or a pressure distribution system, an effluent pump sends it from a dosing chamber in measured doses.

Effluent has already settled and may pass through a filter or screened vault. The pump is designed for the remaining solids and for the pressure needed to move the liquid through the dispersal system.

What Is a Sewage Pump?

A sewage pump, also called a sewage ejector in some installations, handles raw wastewater before treatment. The International Plumbing Code generally calls for a 2-inch spherical solids capacity for pumps receiving toilet discharge and provides separate provisions for grinder pumps. Confirm the locally adopted requirements. Our comparison of sewage ejector vs sump vs sewage pumps explains the differences.

Effluent vs Sewage vs Sump vs Grinder: Comparison Table


Effluent pump

Sewage pump

Sump pump

Grinder pump

What it pumps

Settled septic tank effluent, gray water

Raw sewage with solids

Groundwater, drainage, clear water

Raw sewage, ground into slurry

Solids passage

Small, about 1/2 to 3/4 inch (3/4 inch on Myers ME)

Typically 2-inch spheres where toilets discharge. Check local code and equipment ratings.

Small, varies by model

Grinds solids, no large passage needed

Where installed

Pump tank or dosing chamber after the septic tank, or ATU pump chamber

Basin collecting building waste, lift station

Basement or crawlspace pit

Basin feeding long runs or pressure sewers

Typical discharge

Varies by model. Many Myers ME models use 2-inch NPT.

Commonly 2 inch or larger (2 inch NPT on Myers MW)

Varies, usually smaller than sewage pumps

Varies by model and the locally adopted code.

Typical controls

Floats or timer dosing via control panel, high-water alarm

Floats, simplex or duplex panel, alarm

Built-in or tethered float

Panel with floats and alarm

For the grinder side of the comparison, see grinder pump vs sewage ejector pump.

Effluent Pump vs Sump Pump

Some models are rated for both groundwater drainage and effluent. Choose a pump specifically rated for septic dosing and check its curve at the system’s required flow and head. A general-purpose submersible sump pump may lack the necessary ratings.

Typical Uses for an Effluent Pump

  • Pumping to a drain field that sits higher than the septic tank outlet.
  • Mound systems, which receive effluent in measured doses from a pump chamber.
  • Pressure distribution and low-pressure dosing, where small orifices in the laterals need steady pressure to spread effluent evenly.
  • Aerobic treatment units (ATUs) that discharge treated water to spray heads or a dispersal field.
  • Drip dispersal, which the EPA notes relies on a dose tank and timed doses.

Not Sure Which Pump Your System Needs?

Tell us the tank layout, lift, and distance, and we will help you narrow it down. Call (844) 378-6771 or browse Myers submersible pumps.

How to Choose an Effluent Pump

1. Start With the Design

Start with the approved septic design. For a mound or pressure-dosed field, it should specify the dose volume, required flow and pressure at the ends of the laterals. Confirm permitting and equipment requirements with the local authority.

2. Calculate Total Dynamic Head and GPM

Add the static lift, friction loss through pipes and fittings, and the pressure required by the dispersal system. Choose a model whose curve delivers the design flow at that total dynamic head. Maximum flow and shut-off head describe different points on the curve.

3. Pick Float Control or Timer Dosing

Demand dosing starts and stops the pump at specified float levels. Timer dosing uses scheduled runs to distribute flow across the day. Follow the septic design for dosing and high-water alarm requirements. See our float switch guide or browse replacement float switches.

4. Add a Control Panel and High-Water Alarm

Manual-switch effluent pumps (Myers lists its ME50 through ME150 models as manual) need an external float or a control panel to turn them on and off. A control panel gives you a disconnect, motor protection, run lights, and an audible and visual alarm. Commercial or high-use systems often go duplex for backup. Browse pump control panels, read our duplex pump control panel guide for alternation and alarm logic, or compare simplex vs duplex pump systems.

5. Choose the Material

  • Cast iron: heavy, durable, sheds motor heat well. The usual choice for septic duty.
  • Stainless steel: better corrosion resistance in aggressive water. See cast iron vs stainless steel pumps.
  • Thermoplastic. Lightweight and resistant to corrosion from compatible liquids. Check the manufacturer’s material ratings for the application.

6. Match Voltage and Phase

Effluent pumps come in 115V and 230V single phase, with three-phase options on larger models. Make sure the pump, panel, and supply match. Our guide to single-phase vs three-phase pumps and control panels walks through it.

Myers Effluent Pumps at ePumps

Browse the ME45, ME50, ME75, ME100 and ME150 in our Myers pump collection. Pentair lists the ME45 as a 1/2 HP pump for dosing and drainage. Its ME50 through ME150 models are listed with a 2-inch discharge and a 3/4-inch solids passage. Check the exact model’s curve and connection size. For raw sewage, compare the Myers MW series and confirm the model’s solids rating.

Final Thoughts

Use an effluent-rated pump for settled wastewater and a sewage-rated pump or approved grinder for raw wastewater. Match the pump curve to the system design, then confirm the floats, controls, alarm and local requirements. For other applications, see our drainage and water transfer pumps.

Frequently Asked Questions

Can I use a sewage pump instead of an effluent pump?

Sometimes. The manufacturer should list the pump for effluent service, and its curve must meet the flow and head required by the approved septic design. Check controls and local requirements as well.

Can an effluent pump pump sewage?

Use equipment rated for raw sewage when the pump receives toilet discharge. Effluent pumps are designed for settled wastewater and typically have a smaller solids passage. Confirm the applicable plumbing code before choosing an ejector or grinder.

Where is an effluent pump located in a septic system?

It sits in a pump tank, dosing chamber, or the second compartment of the septic tank, after the solids have settled out. It is often installed inside a screened vault or behind an effluent filter, then pumps to the drain field, mound, or dispersal system.

How long should an effluent pump run?

That depends on the system design. Float-controlled systems run until the dose volume is pumped out, while timer-dosed systems run for set intervals specified by the designer. A pump that runs constantly or cycles far more often than designed can signal a leaking tank, failed float, or excess water entering the system.

Get Help Choosing an Effluent or Sewage Pump

Our team can match a pump, floats, and control panel to your system. Call (844) 378-6771 or contact customer service.